Friday, 2 March 2012

Windows delivered and 2nd floor flooring installed

It's been a week since the frame was started and this rain is slowing us down. Little bit concerned how much water the window frames and upstairs floor can take before they start to become damaged. :(

1 comment:

  1. Top floor is particle board tongue and groove .. particle board and water do not mix well.

    ReplyDelete