The electrical fitout was started today. We have most of the wires for light switches and power points now prepped and poking through the holes in the gyprock.

Plumbing fitout was completed on Friday. We now have a bath, toilets, shower screens, taps, etc all installed.


Ensuite shower head

Loving the colour of our stairs

Only the first coat on our front door, but it looks ok in this picture

Upstairs "game" room